Skip to content

ILC

Sections
Personal tools
You are here: Home » Workgroups » SMTF » Infrastructure

Infrastructure

Up one level
Mechanical Drawings of Meson and New Muon Facilities
Infrastructure Test
Test pattern
Infrastructure Meson Downstream
Meson Downstream
Infrastructure 200kw KLYSTRON TEST MESON SE
This is a pdf drawing showing the Cavity1 and 2 Shielding Cave layout.
Infrastructure Meson SMTF Phase-0 Plan
This contains AutoCad and PDF format, showing the Cavity 1 & 2 layouts
 

Powered by Plone

This site conforms to the following standards: