Main Linac Meetings
Up one level-
ILC Main Linac Meeting
ICB, HQ conference room, 2nd floor,
2006-03-02 15:00:00 -
2006-03-02 16:00:00
- 1. Benchmarking status, Paul, Kirti. 2. OPTIM/analytical results on curved linac. - Alex 3. MatLIAR upgrade status, Kirti, Francois 4. Misc (or CHEFF status - Leo)
-
ILC Main Linac meeting
ICB 2nd floor, engineering conference room ,
2006-03-09 15:00:00 -
2006-03-09 16:00:00
-
francois+kirti
-
ILC Main Linac Meeting
ICB 2nd floor, engineering conference room,
2006-03-16 15:00:00 -
2006-03-16 16:00:00
-
ILC ML meeting
ICB, HQ conference room, 2nd floor. ,
2006-03-23 15:00:00 -
2006-03-23 16:00:00
-
ILC ML meeting
ICB, 2nd floor, HQ at 3pm,
2006-03-30 15:00:00 -
2006-03-30 16:00:00
- CHEFF results - Leo, Paul, Francois Curved linac simulations -Kirti, Alex, Nikolay Misc.
-
ILC ML meeting
ICB, 2nd floor, HQ,
2006-04-13 15:00:00 -
2006-04-13 16:00:00
- Curved linac MATLiar studies - Kirti Realistic lattice design - Alex CHEF Progress -Leo, Francois Merlin status - Paul Misc
-
ILC ML Meeting
ICB, HQ, 2nd floor,
2006-04-20 15:00:00 -
2006-04-20 16:00:00
- 1. Update from Kirti on steering in the curved linac, MatLIAR, etc.; 2. New ML lattice - Alex.; 3. Paul Lebrun - new results; 4. Discussion - everyone.