ILC Technical Status Meetings
Up one level-
ILC Technical Status Meeting
Hermitage Conf Room,
2006-01-25 14:30:00 -
2006-01-25 16:00:00
-
ILC Technical Status Meeting
Hermitage Conf Room,
2006-02-01 14:30:00 -
2006-02-01 16:00:00
- Cavity Development (1.3 and 3.9, ILCTA-MDL Progress (Meson Building) and ILCTA-NM Progress (New Muon, BCP Facility and Processing at Cornell, ANL, Material R&D including large grain and single crystal
-
ILC Technical Status Meeting
Hermitage Conf. Room,
2006-02-08 14:30:00 -
2006-02-08 16:00:00
- • Cryomodule Development (Type III+, Type IV, ILC and 3.9) • Tuner, Vessel etc development (Dressing of Cavities) • ILCCA-MP9 Progress: CAF • Cost and Schedule.
-
ILC Technical Status Meeting
Hermitage Conf. Room,
2006-02-15 14:30:00 -
2006-02-15 16:00:00
- • Coupler Development Including Test Stand (1.3 and 3.9) • EP Facilities Studies • Controls • Instrumentation
-
ILCTA Meeting
Hermitage Conference Room,
2006-03-01 14:30:00 -
2006-03-01 16:00:00
- ESNET link: ID 82ILCTA Phone Number: 510-883-7860, code 82ILCTA#