|
|
ORC Review Documents and Commentary
|
|
2009-04-01 10:43:04 |
published |
|
|
ACC39 Introduction, Parameters, and Specifications
|
471.0 kB
|
2009-04-29 15:25:53 |
published |
|
|
3.9 GHz cryomodule hazard/risk analysis
|
72.5 kB
|
2009-04-16 16:29:24 |
published |
|
|
3.9 GHz Cryostat Pressure Specification
|
70.5 kB
|
2009-03-23 14:23:40 |
published |
|
|
Vacuum Vessel Engineering Note and Documents
|
|
2009-01-30 09:39:18 |
published |
|
|
Helium Vessel Engineering Note for 3.9-GHz Dressed Cavity, #5
|
|
2009-01-30 14:20:53 |
published |
|
|
Helium Vessel Engineering Note for Cavity #3
|
|
2008-07-24 11:27:27 |
published |
|
|
Helium Vessel Engineering Note for Cavity #8
|
|
2009-01-30 11:11:16 |
published |
|
|
Helium Vessel Engineering Note for Cavity #7
|
|
2009-01-30 11:17:24 |
published |
|
|
Dressed Cavity Drawings
|
|
2008-02-28 08:54:58 |
published |
|
|
ACC39 Interface Specification
|
3.5 MB
|
2009-04-17 13:53:42 |
published |
|
|
Cryomodule Piping Engineering Note
|
|
2009-03-13 13:26:13 |
published |
|
|
3.9 GHz cryomodule piping mechanical loads
|
1.9 MB
|
2009-05-11 09:31:21 |
published |
|
|
Low temperature stresses
|
96.5 kB
|
2009-04-10 15:33:56 |
published |
|
|
Cavity Production Flow Chart for the 3.9 GHz Cavities
|
74.5 kB
|
2009-02-04 11:19:29 |
published |
|
|
Niobium mechanical properties
|
1.9 MB
|
2009-03-02 11:34:00 |
published |
|
|
Cryomodule shipping specification
|
1.8 MB
|
2009-04-14 16:46:38 |
published |
|
|
Helium Vessel Engineering Note for Cavity #4 (spare cavity)
|
|
2009-02-03 08:41:35 |
published |
|
|
Old versions of documents
|
|
2009-01-30 11:28:42 |
visible |